Instrument bezels, compass covers, sheave covers, batten parts, tiller grips, port trim, and switch panel pieces for older sailboats.
Sailboats last for decades and their plastic parts do not. On a thirty year old boat the hull is fine, the rig is fine, and the instrument bezel, the hatch handle, or the port trim ring is cracked and long out of production. The builder may not exist anymore.
Send us the original, even in pieces, and we rebuild it in a marine grade printing material. ASA for anything in sun and spray, polycarbonate for parts that see impact or heat, nylon for parts that flex, and TPU for seals and pads.
Bezels, compass covers, and instrument housings.
Hatch handles, port trim rings, and vent covers.
Plastic covers and cheeks on blocks and sheaves that carry no load.
Tiller grips, wheel trim, and handles.
Batten tensioners, end caps, and slide stops for light duty use.
Switch panel pieces, light covers, and cabin trim.
We choose the material from what the part has to survive, not from what it was originally made of.
| Where the part lives | Material | Why |
|---|---|---|
| Sun, heat, weather | ASA | UV stabilized and weather resistant, the right pick for anything that lives outside. |
| Heat and impact | Polycarbonate | Highest heat tolerance of the group and very tough. |
| Clips, latches, wear | Nylon | Tough and slightly flexible, so snap fits and latches do not crack. |
| Bumpers, seals, grips | TPU | Rubber like flexibility in a range of hardness. |
We do not print anything in the rig that carries load, such as blocks, shackles, or fittings under sheet or halyard tension, and nothing below the waterline. Those stay metal or certified hardware.
One. Request a quote and describe the part. A photo helps. Two. Mail the part to the address we send you, every fragment included, or in metro Atlanta ask us to pick it up. Three. We model it and send the price and ship date. Four. Approve, and we print, finish, and ship the part back with your original.
Send us the part, a photo, or a file. You get the price and the turnaround before any work begins.
Get a Free Quote